Model Deviz Lucrari Constructii Word [upd] Instant

| No. Crt. | Description of Work / Material | UM (Unit) | Quantity | Unit Price (RON) | Total (RON) | | :---: | :--- | :---: | :---: | :---: | :---: | | | PREPARATORY WORKS | | | | | | 1 | Manual excavation (foundation trench) | mc | 45.00 | 85.00 | 3,825.00 | | 2 | Removal of debris (incl. transport) | to | 20.00 | 180.00 | 3,600.00 | | B | CONCRETE & REINFORCEMENT | | | | | | 3 | Concrete C16/20 (B250) – foundation | mc | 30.00 | 420.00 | 12,600.00 | | 4 | Steel reinforcement (PC52) | kg | 1,200.00 | 5.50 | 6,600.00 | | 5 | Formwork (wood/metal) | mp | 85.00 | 65.00 | 5,525.00 | | C | MASONRY | | | | | | 6 | AAC block wall (30 cm thick) | mp | 210.00 | 95.00 | 19,950.00 | | 7 | Cement mortar (M10) | mc | 12.00 | 310.00 | 3,720.00 | | TOTAL DIRECT COSTS (A+B+C) | | | | | 55,820.00 |

This is the core of your document. Create a table with the following columns: model deviz lucrari constructii word

"Tencuială brută pe bază de ciment, aplicată mecanizat, grosime medie 2cm." 💡 Best Practices for Word Templates transport) | to | 20

Nu descărcați fișiere ".exe" sau ".docm" (cu macro-uri) din site-uri nesigure. Virusii în domeniul construcțiilor sunt o realitate și pentru fișierele de birou. You can adjust this template according to your

You can adjust this template according to your specific needs and requirements. It's also a good idea to consult with a construction expert or a quantity surveyor to ensure that your deviz is accurate and comprehensive.